Projects

Recreation camp of enterprise “Titan”

Zolotoe, Crimea

A project was developed and electric fitting works on the electrical equipment of cottages as well as laying of 0.4 kV and 10 kV cable and overhead transmission lines were carried out. Drawing up an agreement on electricity use and connecting the electrical equipment according to a permanent scheme. Accompanying support of electrical projects. The facility was commissioned.

монтажные работы по подключению производственного электрооборудования

Enterprise “Titan”

Armyansk, Crimea

A project was developed and electric fitting works on connecting the process electrical equipment as well as laying of 0.4 kV, 10 kV, 35 kV cable and overhead transmission lines were carried out. Audit and expert assessment of process electrical equipment. Drawing up an agreement on electricity use and connecting the electrical equipment according to a permanent scheme. The facility was commissioned.

аудит использования электроустановок

оформление экспертной оценки электрооборудования

“PRILUKSKY zavod” LLC

Pryluky, Chernihiv region

Usage audit of the electrical equipment, drawing up an expert assessment of the electrical equipment in production processes and introducing an automatic control system for electricity metering.

прокладка кабельных и воздушных линий

Gated community

Berezovka, Kyiv region

A project was developed and electric fitting works on the electrical equipment of cottages as well as laying of 0.4 kV and 10 kV cable and overhead transmission lines were carried out. Drawing up an agreement on electricity use and connecting the electrical equipment according to a permanent scheme. Accompanying support of electrical projects. The facility was commissioned.

разработка системы внутреннего электроснабжения

Shopping center “Silpo”

Kyivska str., v. Sofiyivska Borshchagivka. 

The power capacity of the facility is 500 kW, the second category of electric power supply

The project was developed:

  • laying of CL-10 kV;
  • construction and installation works of 10/0.4 kV transformer substation, which is designed to be separately located;
  • development of interior electric power supply system;
  • installation of grounding system for TS-10/0.4 kV;
  • The facility was commissioned.

пуско-наладочные работы системы учета электрической энергии

Business center “Kyivskyi”

Kyivska str., v. Sofiyivska Borshchagivka. The power capacity of the facility is 230 kW, the second category of electric power supply

A project was developed and the following works were carried out:

  • laying of four CL-0.4 kV from SG-0.4 kV (switchgear) of TS-10/0.4 kV, which is being erected, to OSG-1 (outdoor switch-gear) and IDD-2 (input distribution device) of complex for daily life services;
  • installation of condenser power factor correction unit;
  • installation and commissioning works of electricity metering system and ADAS (automatic data acquisition system) in accordance with the requirements of “DTEK Kyiv Electric Networks”;
  • development of interior electric power supply system;
  • installation of protection grounding loop.

The facility was commissioned.

расчет электрической нагрузки

The Sixth Administrative Court of Appeal

Moskovska str., Kyiv. 

A power load for possible transition to electric heating was calculated, taking into account the existing one. The electric fitting works on connecting the permit system of entering the service cars of the Court of Appeal in to the parking area were carried out.

установление системы сигнализации

The State Service for Special Communication and Information Protection

Kyiv

The project, which is provided the following services, was developed:

  • replacement of the existing cells of SG-10 kV, transition of the existing CL-10 kV to new cells;
  • laying of 10 kV cable transmission lines;
  • installation of grounding system for built-in TS-10/0.4 kV;
  • installation of alarm system.

работы по монтажу системы внешнего и внутреннего электроснабжения

Recreation camp “Morewell”

Kyivska str., v. Tolokun, Kyiv region.

The power capacity of the facility is 140 kW, the third category of electric power supply

A project was developed and electric fitting works on exterior and interior electric power supply system were carried out. Installation of OL-10 kV and new PTS-250 kVA. Laying of 0.4 kV cable transmission line from switchgear of TS to IDD of the facility to be designed. Installation of compensating device. Installation of ALT system for uninterrupted electric power supply of the facility from diesel-generator unit. Installation of protection grounding loop. The facility was commissioned.

Установка системы учета электроэнергии

Garage cooperative “LADA”

Vokzalna str., u.t.s. Glevakha, Kyiv region.

The power capacity of the facility is 35 kW, the third category of electric power supply

A project was developed and electric fitting works on the installation of exterior and interior electric power supply system were carried out. Installation of electricity metering system in accordance with the requirements of PJSC “Kyivoblenergo”. Installation of protection grounding loop. The facility was commissioned.

реконструкция КТП

Shoe-repair shop complex

  1. Lutsenko str., Brovary, Kyiv region. 

The power capacity of the facility is 90 kW, the second category of electric power supply

A project was developed and electric fitting works were carried out:

  • reconstruction of PTS with replacement of power transformer 63 kVA by 160 kVA;
  • construction of OTLI 0.4 kV;
  • installation of input distribution device in switchboard room of building;
  • installation of condenser unit;
  • installation of protection grounding loop;

Drawing up an agreement on electricity use.

The facility was commissioned.

сооружение встроенной трансформаторной подстанции

The State Service for Special Communication and Information Protection

Kyiv 

The project, which is provided the following services, was developed:

  • re-equipment of busbar sections of SG-10 kV with vacuum circuit breakers for a new cell set;
  • construction of built-in transformer substation of 10/0.4 kV voltage with dry-type transformers 2х1000 kVA;
  • laying of C-0.4 kV to consumer from various sections of SG-0.4 kV of TS-10/0.4, which is being built;
  • installation of electricity metering system in accordance with the 
  • requirements of “DTEK Kyiv Electric Networks”;
  • installation of protection grounding loop.

Установка и настройка системы ЛУЗОД

Shopping and Entertainment Center “Kvadrat”

Yury str., Sviatoshynskyi district, Kyiv.

Replacement works of meters. Installation and configuration of LEDAP system.

Замена кабельной сборки

“FOOD ART GROUP” LLC

Sichovych Striltsiv str., Shevchenkivskyi district, Kyiv

The power capacity of the facility is 275 kW, the third category of electric power supply

A project was developed and electric fitting works on laying 0.4 kV cable transmission lines were carried out. Replacement of cable assembly. Installation and configuration of LEDAP system.

монтаж сети наружного освещения

Kyiv City Clinical Hospital No. 8

Yu. Kondratyuka str., Obolonskyi district, Kyiv.

    • the enterprise was technically surveyed and assessed;
    • Based on the technical survey, decision was taken to issue the terms of reference for the project development;

 

  • The projects “Reconstruction of grounding loops”, “Reconstruction of ventilation system”, “Reconstruction of external lighting network” were developed, according to which the following works were carried out:

 

    • calculation of grounding resistance, determination of parameters of vertical and horizontal grounding conductors;
    • installation of grounding system manufactured by OBO BETTERMANN;
    • connection of new grounding loops to main grounding busbars of switchboards and equipment;
    • calculation of ventilation system with intermittent air supply;
    • installation of supply and exhaust ventilation system;
    • commissioning works of ventilation system;
    • calculation of the necessary illumination for hospital territory;
    • selection of energy-efficient lamps and equipment for exterior lighting;
    • installation of exterior lighting and its structural elements;
    • filling-in of acceptance and delivery reports.